Page not found

Search results

  1. News and Announcements

    Administration | Page

    Closure Alert NEWS RELEASE: Caltrans and MCTC Celebrate Start of SB 1- Funded Widening of State Route 99 ... SR 233 Corridor Planning Study/Downtown Master Plan News Release: California Transportation ... Commission Approves TCEP for SR 99 Madera South Widening Project High-Speed Rail Transportation Survey ...

  2. MCTC Board Meeting

    Measure T Citizens Oversight Committee | Calendar Event

    state that could be built if the state had new funding, now identifies the types of projects that might ... system, including $400 million specifically for bridges and culverts. SB 1 funds will enable Caltrans to ... movements along the entirety of the State Route (SR) 41 corridor running through both Fresno and Madera ...

  3. MCTC Board Meeting

    Measure T Citizens Oversight Committee | Calendar Event

    state that could be built if the state had new funding, now identifies the types of projects that might ... system, including $400 million specifically for bridges and culverts. SB 1 funds will enable Caltrans to ... movements along the entirety of the State Route (SR) 41 corridor running through both Fresno and Madera ...

  4. MCTC Board Meeting

    Measure T Citizens Oversight Committee | Calendar Event

    State Route 99, major freight movement corridors identified as part of the United States Department of ... projects on the state highway system that would not result in increasing capacity (i.e. widening). Caltrans ...

  5. Clone of Your Madera 2042 RTP/SCS

    Transportation | Page

    California along State Route (SR) 99, approximately 18 miles north of Fresno. The County has an average ... federal and State funding. The last RTP was adopted by MCTC’s Policy Board in July 2014 and was amended in ... (SB) 375, with the goal of ensuring that the MCTC region can meet its regional greenhouse gas reduction ...

  6. Your Madera 2042 RTP/SCS

    Transportation | Page

    California along State Route (SR) 99, approximately 18 miles north of Fresno. The County has an average ... FATALITY ANALYSIS REPORTING SYSTEM SGR- STATE OF GOOD REPAIR MCTC 2018 Regional Transportation ... federal and State funding. The last RTP was adopted by MCTC’s Policy Board in July 2014 and was amended in ...

  7. Your Madera 2046 RTP/SCS

    Transportation | Page

    Opening Year Total Cost Caltrans State Route 99/233 Chowchilla Multimodal Interchange In Madera County, on ... State Route 99 from 2.6 miles north of Avenue 24 OC to 1.3 miles south of Le Grande Avenue OC. Also, on ... sidewalks and add a new westbound structure. 2028 $32,696,000 Caltrans State Route 99 Avenue 7 to Avenue 12 ...

  8. MCTC Board Meeting

    Administration | Calendar Event

    Annual Listing of Projects on the MCTC Website, which includes a list of federally funded projects that ... 2020 Interregional Transportation Improvement Program (ITIP) proposes to delete the State Route 99 ... course. MCTC Staff spoke in support of completing the Merced to Bakersfield Segment at the State Assembly ...

  9. MCTC Board Meeting

    Administration | Calendar Event

    funding made up of Federal funding, State SB1, and State Highway Account (SHA) funding. The ... about $440M in ATP funding made up of Federal funding, State SB1, and State Highway Account (SHA) ... to approving claims of Local Transportation Funds (LTF) for streets and roads. The MCTC’s Social ...

  10. Fresno-Madera State Route 41 and Avenue 9 Sustainable Corridors Study

    Transportation | Page

    Planning FRESNO-MADERA STATE ROUTE 41 AND AVENUE 9 SUSTAINABLE CORRIDORS STUDY Fresno Council of ... .....................................................................................................................................79 FRESNO-MADERA STATE ROUTE 41 AND AVENUE 9 SUSTAINABLE CORRIDORS STUDY Fresno Council of ... FRESNO-MADERA STATE ROUTE 41 AND AVENUE 9 SUSTAINABLE CORRIDORS STUDY Fresno Council of Governments + Madera ...

Pages